Q37
K2 FL-5.4.1

You need to update one of the automated test scripts to be in line with a new requirement. Which process indicates that you create a new version of the test script in the test repository?

Select ONE option.

  • A.

    Traceability management

  • B.

    Maintenance testing

  • C.

    Configuration management

  • D.

    Requirements engineering

Q37
K2 FL-5.4.1

Which of the following BEST describes an example of how configuration management (CM) supports testing?

Select ONE option.

  • A.

    Having the version number of the environment, the CM tool can retrieve the version numbers of libraries, stubs and drivers used in that environment

  • B.

    Having a record of the values of the inputs, the CM tool can execute the test cases for these configurations and calculate the coverage

  • C.

    Having data about the date of purchase of a software license, the CM tool automatically generates information about the fact that the product license is coming to an end

  • D.

    Having the version number of the test case, the CM tool can automatically generate test data for this test case

Q37
K2 FL-5.4.1

Which of the following is NOT an example of how configuration management supports testing?

Select ONE option.

  • A.

    All commits to the repository are uniquely identified and version controlled

  • B.

    All changes in the test environment elements are tracked

  • C.

    All requirement specifications are referenced unambiguously in test plans

  • D.

    All identified defects have an assigned status

Q37
K2 FL-5.4.1

The user reported a software failure. An engineer from the support team asked the user for the software version number where the failure was observed. Based on the version number, the team reassembled all the files that made up the release. This later allowed a developer to perform analysis, find the defect, and fix it.

Which of the following enabled the above activity to be performed by the team?

Select ONE option.

  • A.

    Risk management

  • B.

    Test monitoring and control

  • C.

    Whole team approach

  • D.

    Configuration management